o cross trained with carpenters and installed 250 linear feet of lumber; repaired 190 square feet of roof compromised by snow and water damage

o constructed a storage rack on his own initiative to improve unit efficiency and safety within the company warm storage building

o cross-trained 11 soldiers in common plumbing procedures; expanded capability and readiness by 200%

o cross-connection survey team member; identified 32 cross-connections, maintained potable water system

o ran work schedule for 12 Soldiers, scheduled and completed 190 work orders with zero discrepancies

o received a 98% on coursework and made the Commandants list; also selected from among his peers to attend the Leadership board

o supervised water system upgrade project; installed heater, 10 feet of pipe and fittings--continual hot water to MMG/CC section

o resolved barracks hot water interruption; troubleshot and calibrated 22 fixtures to restore service for 120 Soldiers in less than 2 hours

o rebuilt pump station and 500 foot main to pump 200,000 gallons of sewage and prevent contamination

o managed water and waste operations; serviced 20 water tanks, 6 grease traps and 22 portojohns to sustain service and operations

o aided immeasurably in the ten-man contingent's successful completion of the vierdaagse military foot march, forging team comradery and international esprit de corp


MOS 21K Plumber Working



o identified 16 Backflow prevention device deficiencies; maintained safe drinking water and ensured 100% device function

o performed over 100 critical annual and semi-annual PMCSs on equipment

o served as wrecker operator during the battalion's AT

o trained and qualified 10 Soldiers in their Warrior Task Training and technical fields

o installed 2" DFAC tank fill valve to contain 3,000 gallon fire suppression liquid; ensured daily safety of 1,000 residents

o prepared section for field operations; his ability to multitask and manage multiple training events guaranteed successful Annual Training.

o installed three cadillac pumps and pressure switches to restore service to camp showers and toilets in less than 7 hours

o repaired vehicle maintenance shop water supply break and restored potable water in less than 2 hours

o filled SFC role for 3 months; supervised 6 Soldiers, managed 2 programs and over 160 work orders to maintain $2.5 billion in infrastructure

o maintained 160K gallon base pool; performed PMIS and chemical testing daily to ensure availability of vital MWR facility to more than 3,000 base residents

o disposed of more than 40,000 gallons of raw sewage due to host nation lift station failure and enabled continuous operations